Ventilation Requirements and Infiltration
ASHRAE Technical Committee 4.3

Agenda

Tip: Upload Your Agenda documents to the /documents/agenda/ directory and it will show up here automatically.

TC0403 St Louis Agenda 20160627

TC0403 Orlando Agenda 20160126

Upcoming TC Meetings

Tip: Copy and Paste Your Upcoming Meeting Information in this area.

Location: Orlando, FL

Monday, 1/25/2016

Room

4:15 PM - 6:30 PM - Main Committee

Pocket Lake, Hilton (L)

Minutes

Tip: Upload your Minutes documents to /documents/meeting-information/ directory for them to show up here. The file names must include minutes as in "TC0709 draft Minutes Atlanta 20150628.pdf".

Committee Chair

Tip: This section automatically generated from site Configuration file.

Josephine Lau TC0403@ashrae.net

Committee Scope

Tip: This section automatically generated from site Configuration file.

TC 4.3 is concerned with ventilation requirements and the analysis of infiltration, airflow around buildings, exhaust, and the re-entry of exhaust, including their integration interactions with indoor air quality and energy calculations for buildings and HVAC system design and operation performance and energy consumption.

icon

Upcoming Society Conferences

2016 Annual Conference
June 25 - 29, 2016
St. Louis, Missouri

2017 Winter Conference
Jan. 28 - Feb. 1, 2017
Las Vegas, Nevada

Tip: You can put any type of content in the following section.

.

Additional Information

Want to become involved in ventilation, infiltration, and indoor air quality (IAQ) issues at the Society level?
Please read through this web site and attend the physical-reality general and subcommittee meetings of TC 4.3 at the ASHRAE Annual and Winter Meetings!